Labconco Protector Stainless Steel Radioisotope Laboratory Fume Hoods 9682200 User Manual

Page 15

Advertising
background image

11

Product Service 1-800-522-7658









C

C

H

H

A

A

P

P

T

T

E

E

R

R

3

3

G

G

E

E

T

T

T

T

I

I

N

N

G

G

S

S

T

T

A

A

R

R

T

T

E

E

D

D

Now that the site for your laboratory fume hood is
properly prepared, you are ready to unpack, inspect,
install, and certify your unit. Read this chapter to learn
how to:

• Unpack and move your Protector Radioisotope

Hood.

• Set up the fume hood with the supporting

structure and work surface.

• Connect to an exhaust system.

• Connect the optional filter packs to the exhaust

system (not sold through Labconco).

• Connect the electrical supply source.

• Connect the service lines.

• Seal the Protector Radioisotope Hood to the

hardboard support (included).

• Arrange certification of your Protector

Radioisotope Hood.


Depending upon which model you are installing, you
may need common plumbing and electrical installation
tools in addition to 5/16", 3/8", 7/16", and 1/2"
wrenches, ratchets, sockets, a nut driver set, a flat-blade
screwdriver, a Phillips screwdriver, and a carpenter
level to complete the instructions in the chapter.

The Protector Radioisotope Hood
models weigh between 500 to 700 lbs.
(227-318 kg). The shipping skid
allows for lifting with a mechanical lift

!

Advertising