Labconco Protector Stainless Steel Radioisotope Laboratory Fume Hoods 9682200 User Manual

Page 19

Advertising
background image

15

Product Service 1-800-522-7658

Chapter 3: Getting Started


4. Anchor cabinet(s) with seismic restraints if

required by the local code in your area.

Figure 3-1

5. Secure the hardboard to the top of the base

cabinet(s) using adhesives with the Solvent
Storage Cabinets(s) or mechanical fasteners
with the Acid Storage Cabinet(s). Figure 3-1

6. After completing step 5, apply a sufficient

quantity of adhesive to the top surface of the
hardboard.

7. Place the hood on top of the work surface

and cross support.

8. First wrap the weights to protect the hood’s

hardboard surface. Place heavy weights on
the inside of the fume hood for
approximately 24 hours. This provides a
proper bond of the adhesive.

Step 5

Step 4

Advertising