Service line requirements, Space requirements – Labconco Protector XStream Laboratory Fume Hoods 9840803 User Manual

Page 12

Advertising
background image

8

Product Service 1-800-522-7658

Chapter 2: Prerequisites


by a qualified electrician. Refer to Chapter 3: Getting Started and
Appendix C: Protector XStream Specifications for the wiring
diagram for proper electrical installation.

Service Line Requirements

All service lines to the laboratory fume hood should be ¼ inch
outside diameter, copper (brass for natural gas), and equipped with
an easily accessible shut-off valve, should disconnection be
required. If the service line pressure exceeds 40 PSI, it must be
equipped with a pressure regulator to reduce the line pressure.
Please check with local codes for other requirements.

Space Requirements

The dimensions for the different models are shown in Appendix B:
Protector XStream Dimensions
.

Advertising