Chapter 3: Getting Started

Product Service 1-800-522-7658

9

THE UNITED STATES INTERSTATE COMMERCE
COMMISSION RULES REQUIRE THAT CLAIMS BE
FILED WITH THE DELIVERY CARRIER WITHIN
FIFTEEN (15) DAYS OF DELIVERY.

DO NOT RETURN GOODS WITHOUT THE PRIOR
AUTHORIZATION OF LABCONCO. UNAUTHORIZED
RETURNS WILL NOT BE ACCEPTED.

IF GAS PURIFIER WAS DAMAGED IN TRANSIT, YOU
MUST FILE A CLAIM DIRECTLY WITH THE FREIGHT
CARRIER. LABCONCO CORPORATION AND ITS
DEALERS ARE NOT RESPONSIBLE FOR SHIPPING
DAMAGES.

Do not discard the packing material until you have checked all of the
components and tested the Gas Purifier with the controlled atmosphere
glove box.

Installing the Gas Purifier on a Supporting

Structure and Work Surface

Exercise caution when lifting or moving the Gas Purifier. Do not lift the
Gas Purifier using the isolation valve handles.

When installing the Gas Purifier onto a surface, ensure that the structure can
safely support the weight of the Gas Purifier and any related equipment such
as the vacuum pump. The Labconco base stands from Chapter 7 offer a
lower shelf with optimized placement of the Gas Purifier on the right side
under the transfer chamber. Refer to Figure 1-1 in Chapter 1 and Figure 3-8
in Chapter 3. The lower shelf can also support the rotary vane vacuum pump
accessory as shown in Figure 3-8.

Connecting the Electrical Supply Source to the

Gas Purifier

Connect the power cord supplied to the IEC electrical supply plug located on
the back of the Gas Purifier. 100-115V models are rated at 10 amps total.
230V models are rated at 5 amps total. If a dedicated vacuum pump is used
for the Gas Purifier, one electrical outlet is located on the rear of the Gas
Purifier for vacuum pump use and is rated at 100-115V, 8A or 230V, 4.5A.