Single gate operator installation, Gate preperation overview of operator installation – Mighty Mule MM-SL2000B User Manual

Page 16

Advertising
background image

4

SL-2000B Instruction Manual 04.26.12

SINGLE GATE OPERATOR INSTALLATION

Gate Preperation

Overview of Operator Installation

Level

Plumb

Concrete

Concrete

Be sure the gate is properly installed and slides smoothly before installing the SL-2000B Slide Gate Operator.

The gate must be plumb, level, and move freely. The gate must not bind or drag on the ground. Never

use a wheel on the gate, because the additional drag and resistance can cause the operator to obstruct.

The diagram below shows a single slide gate installation with required safety features. The operator

must be installed on the inside of the gate. GTO requires using safety edges and roller guards to help

reduce the possibility of bodily injury.

Chain

Contact Sensor

Roller Guard

Receiver

(cable in separate

conduit)

Roller Guard

Contact Sensor

Contact Sensor

(REQUIRED)

(REQUIRED)

(REQUIRED)

(REQUIRED)

(REQUIRED)

Use PVC Conduit

(not included)

Run 1000' (max.) of low

voltage wire to control

box from transformer

(wire not included).

120 Volt Indoor

Transformer

(Surge Protector

not supplied)

Roller Guard

(REQUIRED)

Chain Bracket

Chain Bracket

for power cables.

1. KEEP CLEAR! Gate may move at any time.


2. Do not allow children to operate gate or

play in gate area.


3. This gate is for vehicles only. Pedestrians

must use a separate entrance.

Moving Gate Can Cause

Injury Or Death

WARNING

!

Operator

Advertising