Control board settings for dual install, Seq1 seq2 – Mighty Mule MM-SL2000B User Manual

Page 33

Advertising
background image

SL-2000B Instruction Manual 04.26.12

21

DIP Switches

The Control Board DIP switches must be set to accommodate your particular type of installation. Since the

SNGL / DUAL, SEQ1, and SEQ2 DIP switches are used by dual gate operator systems, they will be discussed

in the following steps.

Step 4

Make sure the control box power switch is OFF.

Step 5

Unscrew and remove the control box cover. Use a small

screwdriver to move the SNGL / DUAL DIP switch to DUAL

(see illustration)

.

CONTROL BOARD SETTINGS FOR DUAL INSTALL

SEQ1

SEQ2

ON

OFF

Open & Close Simultaneously

ALWAYS USE THIS FOR SLIDE GATE

OFF

ON

N/A

NOT APPLICABLE

ON

ON

N/A

NOT APPLICABLE

OFF

OFF

N/A

NOT APPLICABLE


1234

ON

OBSTRUCT

SENS.

PULL/PUSH

SEQ1

SNGL/DUAL

SEQ2

MIN

MAX

LEARN

VOLTAGE READINGS

18 Vac Transformer

18.0 to 22.0 Vac

10 W Solar panel (single)

18.0 to 22.0 Vdc

In FULL SUN — measure voltage with the Solar Panel Disconnected.

12 V, 7 amp hour Battery

12.5 to 13.5 Vdc

Measure voltage at battery terminals with battery disconnected

Charging circuit

12.0 to 14.8 Vdc

Measure voltage at battery terminals with battery connected

Advertising