Preparing the gates – Mighty Mule MM-SL2000B User Manual

Page 31

Advertising
background image

SL-2000B Instruction Manual 04.26.12

19

Install PVC conduit (not included) needed for power cables and low voltage wiring – see illustration

below. The SL-2000B and SL-2200B power cable and safety edge (required) wiring should be run

through PVC conduit underneath the driveway.

Chain

Roller Guard

Roller Guard

(REQUIRED)

(REQUIRED)

(REQUIRED)

PVC Conduit for

second operator

power cable.

Roller Guard

(REQUIRED)

Chain Bracket

Chain Bracket

PVC Conduit for

second operator

power cable.

Chain

Contact Sensor

Roller Guard

Receiver

(cable in separate

conduit)

Roller Guard

First Operator

Contact Sensor

Contact Sensor

Contact Sensor

Contact Sensor

(REQUIRED)

(REQUIRED)

(REQUIRED)

(REQUIRED)

(REQUIRED)

(REQUIRED)

(REQUIRED)

PVC Conduit for

power cable.

Run up to 1000' of low

voltage wire to control

box from transformer

(wire not included).

120 Volt Indoor

Transformer

(Surge Protector

not supplied)

Roller Guard

(REQUIRED)

Chain Bracket

Chain Bracket

Chain Bracket

First Gate Operator

(Control Unit)

Second Gate Operator

(Auxiliary Unit)

1. KEEP CLEAR! Gate may move at any time.


2. Do not allow children to operate gate or

play in gate area.


3. This gate is for vehicles only. Pedestrians

must use a separate entrance.

Moving Gate Can Cause

Injury Or Death

WARNING

!

1. KEEP CLEAR! Gate may move at any time.


2. Do not allow children to operate gate or

play in gate area.


3. This gate is for vehicles only. Pedestrians

must use a separate entrance.

Moving Gate Can Cause

Injury Or Death

WARNING

!

Second Operator

Contact Sensor

PREPARING THE GATES

Advertising