Vortech 1994-1995 Ford 5.0 Mustang User Manual

Page 20

Advertising
background image

P/N: 4FG020-010

© 2008 Vortech Engineering, Inc.

All Rights Reserved. Intl. Copr. Secured

04NOV08 V2.0(94-95 5.0 Mus.(4FG V2.0))

12

15. DISCHARGE DUCT INSTALLATION

A. Fit the 3" x 2" sleeve onto the throttle body and

secure with the supplied #48 clamp. Loosely slide

the remaining clamp onto the sleeve.

B. Slide the 2-3/4" x 2" sleeve and clamps onto the

discharge tube assembly.

C. Fit the discharge tube onto the throttle body tube

and slide the 2-3/4" x 2" sleeve onto the super-

charger discharge port, tighten down the #44

clamps on both sides.

D. Using the 3/8" hose mender and length of 3/8"

hose supplied, fit into the stock PCV hose and

route to the barb fitting on the inlet duct of the

supercharger. (See Fig. 15-a.)

DISCHARGE

TUBE

3-1/2" x 1" HOSE

VACUUM HOSE

2-1/2" x 1" HOSE

INLET

DUCT

A. Slide the 1" x 3-1/2" hose onto the bypass

valve. Secure with #16 hose clamps. (See

Fig. 16-b.)

B. Slide the 1" x 2-1/2" hose onto the discharge

duct and bypass valve. Secure with hose

clamps. Trim hose length if necessary.

C. Route the 5/32" vacuum line to the bypass

valve and FMU TEE as shown (See Fig. 16-

a.)

D. Using the supplied TEE and length of hose,

cut the hose 4" from the FMU.

E. Install the tee fitting and connect the hose to

the bypass valve.

TO

VACUUM

TEE

HIGH OUTPUT

KIT ONLY

TO BYPASS

VALVE

20"

4"

NOTE:

In some instances you may have to trim or shorten

these ducts for fit and ease of installation due to

differences in components.

Fig. 15-a

16. BYPASS VALVE INSTALLATION (High-Output System Kit Only)

Fig. 16-b

Fig. 16-a

OIL

STOCK

PVC

HOSE

3/8” HOSE

MENDER

3/8” HOSE

TO INLET DUCT

Advertising