Doremi ShowVault / IMB User Manual

Page 12

Advertising
background image

CRT.OM.001087.DRM

Page 12 Version 1.7

Doremi Labs

Connect two power cables into the ShowVault; it is the same for both the ShowVault-
3RU and ShowVault-4RU (Figure 10).

Figure 10: Power Cables Connected to ShowVault

Note: At this stage, please refer to the Barco projector user manual in order to perform any
projector specific setting.

Figure 11: Barco Series-2 Projector with IMB Installed

Advertising