B. test result/report, A. task list – Xtramus DApps-MPT V1.4 User Manual

Page 389

Advertising
background image


389

E-mail: [email protected]

Website: www.Xtramus.com

XTRAMUS TECHNOLOGIES

®

B. Test Result/Report

You can also view test results in the Test Result/Report section from DApps-MPT

’s main window as well.

a. Task List

You can view all the tasks included in the test, along with the Active Ports that are used in these tasks.

The result of these tasks (Pass/Fail) is displayed with green lights or broken red lights.

Task of the Active Port passes.

Task of the Active Port fails.

If you move the cursor to the Green/Red lights, a little window contains detail information will pop up.

Information listed in this window includes Task Pass/Fail, transmitting/receiving rate, CRC Error, X-TAG,

Dribble Error, Align Error, Under/Over Size Packets, and how many times have you paused the test.

Advertising
This manual is related to the following products: