Test tasks - layer 1: dut-osc, A. setup, B. criteria – Xtramus DApps-MPT V1.4 User Manual

Page 59: C. misc, D. help

Advertising
background image


59

E-mail: [email protected]

Website: www.Xtramus.com

XTRAMUS TECHNOLOGIES

®

9.1. Test Tasks - Layer 1: DUT-OSC

DApps-MPT will start examining Crystal Oscill

ator’s frequency of the DUT and see if it’s either faster or

slower than standard speed in ppm scale.

A. Setup

Test Port: Select the port that will be used for DUT-OSC test.

Media Type: Click the Media Type scroll-

down menu to choose DUT’s link speed.

Minimum Waiting Time: This task will halt at least for the Minimum Waiting Time you input here

during auto-negotiation process.

Media Type Waiting Timeout: If the time spent for auto-negotiation exceeds the Media Type

Waiting Timeout you set here, the test will stop and the test result will be fail.

B. Criteria

OSC PPM Min/Max: Please input the minimum/maximum frequencies (ppm) which will serve as

DUT-

OSC Task’s testing criteria.

C. Misc

Title of task name: You can assign a name to this task for identification.

Apply: Apply the changes you made.

D. Help

All test variables used for this task and their definitions will be listed here for reference.

Advertising
This manual is related to the following products: