Creating task via testing configuration – Xtramus NuApps-IGMP-RM V1.2 User Manual

Page 28

Advertising
background image

4.

Creating Task via Testing Configuration

When performing tests with your DUT on NuApps-IGMP-RM for the first time, you have to create a new set
of test settings to run the test.

Before starting to create a new task via New Testing Configuration, please be sure that:

¾

All module cards (such as XM-RM751, XM-RM761, or XM-RM781) are installed on chassis (such as
NuStreams-2000i/600i) properly.

¾

The chassis (such as NuStreams-2000i/600i) is powered-on and is connected to a PC (or IPC
module installed on NuStreams-2000i) according to “3.1. Starting NuApps-IGMP-RM”.

To start using New Testing Configuration, please click File on the Menu Bar, and choose New Testing
Configuration…
as shown in the figure down below.

A “Reserved Config” window will pop up. All module cards that are installed on the chassis will be
displayed here.


28

E-mail: [email protected]

Website: www.Xtramus.com

XTRAMUS TECHNOLOGIES

®

Advertising