This section describes installation and maintenance requirements.

2.1 Initial Inspection

Remove device from packaging; inspect for any physical damage incurred during
shipment; report any such damage to the carrier.

2.2 Conditions of Use

•

Operate indoors only.

•

Refer to Section 1.3, Specifications, of this manual.

•

Select the correct voltage setting (see Section 2.3, Power-Line Voltage).

•

Ensure that the operating environment power supply is free of dust, vibration,
direct sunlight and corrosive gas.

•

Ensure clearance of at least 10 cm for adequate ventilation.

•

Install a power filter if noise from the AC power source is inevitable.

•

Calibrate annually.