2installation – Beisler 100-58 User Manual

Page 23

Advertising
background image

2-3

2

Installation

Attention

Installation and putting into operation may only be carried out by mechanically
and electrically qualified staff. These people must read and understand the
complete operating manual before starting.

2.1

Technical data

Dimensions

1.600 x 750 x 1.300mm (LxWxH)

Table height

830 mm

Weight

220 kg

Mains power

220 V AC

Power consumption

0,7 kW

Fuse

10 A

Req. air pressure 6 bar

Req. air quality

oil-free

Air consumption 5 NL/WD

2.2

Mechanical installation

Attention

Check before starting the installation, whether the desired location meets the
requirements (see chapter 2.1, technical data). This is very important
regarding the stability of the ground.

2.2.1

Unpack and put up

1. Remove the packing material and possible transportation protections.

2. Position the machine on a solid and horizontal ground.

3. Level the machine to a horizontal stand using the adjustable frame feet.

Advertising