Beisler 1500-70-2 User Manual

Page 29

Advertising
background image

2-5

1. Use the power cord located at the backside of the machine.

2. Plug it into a socket.

3. Lay the cord in a way, that the danger of stumbling is avoided.

Danger

Danger to life from unsufficient grounding! Do a grounding according to DIN
EN 60204-1.

2.4

First putting into operation

This machine has been configured to the individual requirements of the
customer. The first putting into operation can be done easily:

1. Adjust the machine to a horizontal stand.

2. Connect power and air supply.

3. Switch on the machine using the main switch at the front side of the

machine.

4. Check all security systems for function and efficiency.

Danger

The machine may only be used for production purposes, after the safety
installations have been checked. If a safety installation doesn’t work
adequately, it must be repaired first.

As a factory setting, several production programs are contained in the buffer
of the machine. You may use one of them or create your own programs.

Advertising