Dumping – DR Power Tow-Behind 8.00 Premier (Pre-August 2010) User Manual

Page 36

Advertising
background image

32 DR

®

PREMIER LEAF and LAWN VACUUM

Dumping
























Tip: Give the Tilt Bed Handle a little shake after emptying the Collector Box to loosen up the remaining

material. Then drive forward about a foot with the Collector Box in the dump position. Shake the Tilt
Bed Handle again and then lower the Tilt Bed back down and secure the Dump Latch. This usually
gets all but a small amount of material to dump from the Collector Box. Clean or wipe away the
remaining material and you are ready to reinstall the Rear Panel.

Tip: For heavy loads, it may be necessary to manually remove part of the load to reduce the tipping effort.

Figure 27

Release Dump Latch

Blower Exit Elbow

Collector Box Hose

Hold Down,
then Lift

Tilt Bed Handle

Figure 26

1. Disconnect the Collector Box Hose from the

Blower Exit Elbow by releasing the two (2) Flexible
Latches (Figure 26) and separate the Hoses.

2. Remove the Rear Panel of the Collector Box by

releasing the six (6) Fasteners located at the
sides, top, and bottom of the Panel. Lift the Rear
Panel off the mounting Pins on the Collector Box
Cover.

3. While holding down on the Tilt Bed Handle,

release the Dump Latch (Figure 27) and raise the
Tilt Bed using the Tilt Bed Handle (Figure 27).

4. After dumping the load, lower the Tilt Bed,

reattach the Dump Latch, and replace the Rear
Panel.

5. Re-connect the Collector Box Hose to the Blower

Exit Elbow.

ALWAYS SHUT OFF THE TRACTOR ENGINE AND
THE VACUUM ENGINE AND USE CAUTION WHEN
DUMPING THE COLLECTOR BOX LOAD.

THE LOAD MAY HAVE SHIFTED AGAINST THE
REAR PANEL. PUSH DOWN ON THE TILT BED
FRAME WHEN RELEASING THE DUMP LATCH TO
PREVENT THE TILT BED FROM SUDDENLY
TIPPING.

Blower Exit Elbow

Pull and Unhook Latches

Collector Box Hose

Advertising