3.3.5 Inducer

All different impellers can be optionally equipped with
an inducer for low NPSHA applications.

3.3.6 Barrel

The barrel acts as pressure casing. The design
allows that the pump internals can be pulled out fully
assembled as complete hydraulic cartridge.

3.4 Performance and operating limits

In the interest of operator safety

the unit must not be operated above the nameplate
conditions. Such operation could result in unit failure
causing injury to operating personnel. Consult
instruction book for correct operation and
maintenance of the pump and its supporting
components.

4.0 INSTALLATION

Equipment operated in hazardous locations

must comply with the relevant explosion protection
regulations, see section 1.6.4, Products used in
potentially explosive atmospheres.

4.1 Location

The pump should be located to allow room for
access, ventilation, maintenance and inspection with
ample headroom for lifting and should be as close as
practicable to the supply of liquid to be pumped.

Refer to the general arrangement drawing for the
pump set.

4.2 Part Assemblies

The pumps are delivered completely mounted and
prealigned with the motor. Also the shaft seal is in the
correct position. Final alignment after complete
installation is necessary. If drivers and/or seal systems
are delivered separately, follow the assembly
procedure in section 6.8.

4.3 Foundation

The foundation shall be located on a place that allows
a minimum of pipe work and that is easily accessible
for inspection during operation. According to the
environment the foundation may consist of concrete
or of steel. It must be rigid and heavy enough to
absorb normal vibrations and shocks.

4.3.1 Horizontal alignment of the baseplate

Horizontal alignment is done with levelling screws.
Use a spirit level for correct horizontal alignment of
the baseplate.

The max. misalignment is 0.5 mm/m

baseplate length.

4.3.2 Steel foundation

When the pump unit is mounted directly on structural
steel frame, it shall be well supported by constructural
beams. It is recommended to check the natural
frequency of the steel frame, because it shall not
coincide with the pump speed. The exact horizontal
alignment is very important!

Ensure that the base plate is

leveled horizontally to 0.5 mm/m. To avoid any
distortion of put shims under the base plate before
bolting it down to the steel frame. Welding of the base
plate to the steel frame is not recommended because
of possible distortion of the same.

4.3.3 Concrete foundation

A concrete foundation must have an exact horizontal
alignment and must be placed on solid ground. First a
basic foundation shall be built with square shaped
holes for embedding the foundation bolts. After
putting the base plate into the foundation the proper
alignment can be obtained by adjusting it with shims
under the base plate. Now insert the foundation bolts
and grout the space between the basic foundation
and the base plate with grouting cement (refer to
illustration)

It is very helpful to use a properly made and stable
wooden frame around the base plate. So the grouting
cement will not flow side. When the grouting is totally
set and hardened the foundation bolts shall be
tightened in a firm and symmetrical way.

4.4 Initial alignment

The adjustment of motor and pump must be checked
(if necessary, make a new adjustment) before first
start up of the unit.