Flowserve PLEUGER User Manual

Page 24

Advertising
background image

PLEUGER STANDARD USER INSTRUCTIONS ENGLISH 71569293 01-13

Page 24 of 40

flowserve.com

In special cases the filling instructions must be
requested from the manufacturer.

Table 6-7

Mo

tor

ty

pe

Section numbers

6

.6

.1

6

.6

.2

6

.6

.3

6

.6

.4

6

.6

.5

6

.6

.6

6

.6

.7

6

.6

.8

6

.6

.9

6

.6

.1

0

6

.6

.1

1

M6

O

O

O

MP6

O

O

O

MX6

O

O

O

M8

O

O

O

MP8

O

O

O

MX8

O

O

O

MI10

O

O

O

MIP10

O

O

O

MIX10

O

O

O

VNI12

O

O

O

VNI14

O

O

O

MI16

O

O

O

MI19

O

VNI22

O

MI26

O

VNI30

O

= standard

O = optional

Not currently

scheduled

The following instructions are only relevant for filling
and topping up before the first installation, for motors
without a header tank. Before installation ensure that
the motors do not have any leaks.

For installations with a header tank, the liquid level
must be monitored. Installation of an automatic level
control is recommended.

6.6.1 Filling and topping up with a funnel
(See figure 6-1.)
a) Position the motor vertically and prevent the unit

from falling over.

b) Remove the cap [0236] of the vent valve [B6523]

with a screwdriver or similar tool.

The cap [0236] is only used for

protection during transportation and must always
be removed before installation.


c) Screw out the vent valve [B6523] with a ring

wrench or socket wrench (size 17).

Handle seal ring [4510.10] with

care.

d) Fit together the two-part funnel [1], and insert it

into the threaded hole of the removed vent valve.

e) Fill or top up until liquid escapes from the vent

opening.

f) Screw the vent valve [B6523] back in with its seal

ring [4510.10].


6.6.2 Filling and topping up with filling pump
(See figure 6-2.)
a) Position the motor vertically and prevent the unit

from falling over.

b) Remove the cap [0236] of the vent valve [B6523]

with a screwdriver or similar tool.

The cap [0236] is only used for

protection during transportation and must always
be removed before installation.

c) Screw out the inner screw plug [0168] of the

filling valve [B6514].

Handle seal ring [4510] with care.

d) Screw the filling nipple supplied [2] into the screw

plug threaded hole.

Figure 6-1

Advertising