4 verifying motor rotation direction, 1 initial electrical connections – Flowserve L120-85 Actuator User Manual

Page 14

Advertising
background image

Figure 5: L120-85 Thrust Base Assembly orientation (Drive 2)

Drive 2 Actuator

Mounting Base

Actuator

Mounting

Adapter

Threaded

Valve Stem

#101 Thrust Base

(Drive Sleeve)

Thrust Base

Assembly

#110 Socket Head

Cap Screws

#111 Lockwashers

4.4 Verifying Motor Rotation

Direction

4.4.1 Initial Electrical Connections

c

WARNING: Hazardous Voltage. No electrical power should
be connected until all wiring and Limit Switch adjust-
ments have been completed. Once power is supplied to
unit, exercise caution if cover is not installed.

1. Open the Electrical Compartment Cover (piece 200-1) and

remove the Conduit Pipe Plugs from the opening(s) most conve-
niently located for your power leads and other cabling.

Figure 6: Electrical Compartment and Conduit Pipe Plug openings

Conduit Pipe

Plug Locations

Conduit Pipe

Plug Locations

Electrical

Compartment

2. Adjust the Limit Switches, MDPI (Mechanical Dial Position

Indicator) and Potentiometer following the procedures outlined
in Sections 4.5 and 4.7.

3. Ensure Torque Switch is set properly for your application. In

most cases, adjustments are not needed, but if changes are
required, see Section 4.6, “Torque Switch Settings and Wiring”.

4. Connect wiring to Terminal Strips provided on the actuator.

Refer to the wiring diagram supplied with your specific actuator.
“Fork-type” terminal connections are recommended.

5. Be sure any unused conduit entrances are plugged with metal

Conduit Pipe Plugs.

Notes:

a) Explosion-proof actuators require approved “sealing fittings”

installed in accordance with the National Electric Code.

b) Submersible actuators require approved “sealing fittings” in

order to prevent water entering the actuator.

6. Attach grounding wire to Grounding Lug (piece 14).

Limitorque L120-85 Installation, Operation and Maintenance FCD LMENIM1202-00 – 11/05

1

Advertising