Fluke Biomedical ESA620 User Manual

Page 21

Advertising
background image

Electrical Safety Analyzer

Instrument Familiarization

7

Table 2. Top-Panel Controls and Connections

Item Name

Description

1

ECG/Applied Parts
Posts

Connection posts for Device Under Test (DUT) leads, like ECG leads. Used to test for
leakage current through leads and to supply ECG signals and performance waveforms to a
DUT.

2

Nulling Jack

Connection for zeroing test lead resistance. Use the probe attached to the test lead to put
into the null jack. Use the null post adapter when you use the alligator clip attached to the
test lead.

3

Equipment Outlet

Equipment outlet, specific to the version of the Analyzer, which provides a DUT connection.

4

Navigation Buttons

Cursor control buttons for navigating menus and lists.

5

Test Button

Initiates selected tests.

6

Equipment Outlet
Configuration
Buttons

Controls the wiring of the equipment outlet. Opens and closes the neutral and ground
connection and reverses the polarity of the neutral and hot connection.

7

High Voltage
Indicator

Indicates when high voltage is applied to the ECG/Applied Parts posts or L1 and L2 of the
Test Receptacle.

8

Function Softkeys

Keys F1 through F5 are used to select from a number of selections that appear in the LCD
display above each function softkey.

9

Test Function
Buttons

Selects the various Analyzer test functions.

10

Input Jacks

Test lead connectors.

Advertising
This manual is related to the following products: