Step 1 - pour box – FSR SF-IPSP User Manual

Page 4

Advertising
background image


1

2

3

3

2

1

A

B

D

A

B

D

C

C

244 BERGEN BLVD.

W. PATERSON, NJ 07424

TEL (973) 785-4347

FAX (973) 785-3318

TITLE:

DRAWN BY:

DWG#:

DATE:

REV:

SCALE:

JRE

11/03/08

02

1:3

C-1042B


SMART FIT COVER

FLANGE-TO-POKE POUR BOX

ASSEMBLY INSTRUCTIONS

PAGE:

1

3

OF

FSR

inc.

STEP 1 - POUR BOX

(SHOWN REDUCED IN SCALE)

AC DIVIDER TUBE MAY NEED

MODIFICATION, AS SHOWN

ABOVE, TO ALLOW CLEARANCE

FOR ANY IPS INSERTS WHICH,

BENEATH THEIR FACE PANEL,

ARE AS WIDE AS THE FACE PANEL

OR NEARLY SO (E.G., IPS-C612S,

IPS-V310S, IPS-D710S THRU

IPS-D714S), AND PLACED

IN THE -IPSP POSITION NEAREST

THE A/C OUTLET. PRIOR TO POUR

BOX INSTALLATION, VERIFY IF

THIS MODIFICATION IS REQUIRED

BY EITHER PERUSAL OF INTENDED

INSERTS OR BY TEST FITTING

ASSEMBLY OF ALL COMPONENTS.

5/8"

MAX.

FSR MODEL# SF-PB

AC DIVIDER

(SUPPLIED

WITH SF-IPSP)

BARBED CLIP WITH GROUND

LUG (SUPPLIED WITH SF-PD)

(3) BARBED CLIP
(SUPPLIED WITH SF-PB)

TILE FLANGE FSR MODEL# SF-(X)T-CV

OR CARPET FLANGE (SHOWN BELOW)

FSR MODEL# SF-(X)C-CV

(4) #6-32 x .250 LONG SCREW

(SUPPLIED WITH SF-(X)T-CV

AND SF-(X)C-CV)

Advertising