3. REMOVE AND RETAIN TEMPORARY COVER AND SCREWS.

TEMPORARY

COVER

(8) #6-32 FLAT

HEAD SCREWS

4. REMOVE (4) 1-1/2" KNOCKOUTS LOCATED ON BOTTOM

OF FLOOR BOX. ALL OTHER KNOCKOUTS IN THE BOX
ARE NOT TO BE USED OR REMOVED.

FLOOR BOX

REMOVE (2) 1-1/2"

KNOCKOUT

REMOVE (2) 1-1/2"
KNOCKOUT

(4) 1-1/2" CONDUIT
LOCKNUT

(4) 1/4-20 x 6.00"
LONG HEX BOLT

5. INSTALL INTUMESCENT-LINED CONDUIT AND FLOOR BOX

LEVELING BOLTS AS SHOWN.

6. INSTALL FLOOR BOX INTO PAN. LEVEL BOX TO PROPER HEIGHT

WITH LEVELING BOLTS. ANCHOR BOX USING WIRE (SUPPLIED BY
OTHERS) TO PREVENT BOX FROM FLOATING DURING POUR.

7.

NOTE: MINIMUM POUR HEIGHTS FOR UL 2-HOUR

FIRE CLASSIFICATION:

CORRUGATED DECK:

LIGHTWEIGHT CONCRETE: 3-1/4"
NORMAL WEIGHT CONCRETE: 4-1/2"

FORMED DECK:

LIGHTWEIGHT CONCRETE: 3-3/4"
NORMAL WEIGHT CONCRETE: 5"

(4) INSERT LEVELING
BOLT INTO HOLE

FLOOR BOX

PAN

LEVELING
BOLT

WIRE (BY OTHERS) TO
SECURE BOX DURING POUR

(4) INTUMESCENT-LINED CONDUIT

3.25 MIN
6.00 MAX

3.50 MIN
6.25 MAX

CONCRETE

1.9 MIN
4.6 MAX

GANG BRACKET SCREWS AND GROUND SCREWS MUST BE IN PLACE AND
BOTTOMED TO ENSURE SCREW VOIDS AFTER POUR.
REINSTALL TEMPORARY
COVER. FILL VOIDS BETWEEN DECK CUT-OUT HOLE AND PAN WITH TAPE OR CAULK
TO PREVENT CONCRETE LEAKAGE WHILE POURING. DURING POUR, A VIBRATORY
TOOL MUST BE USED TO ENSURE COMPLETE FILL OF CONCRETE SURROUNDING THE
FLOOR BOX WITHIN THE PAN ASSEMBLY.

FILL\COVER VOIDS BETWEEN

DECK AND PAN AS NECESSARY

TO PREVENT CONCRETE

LEAKAGE