FSR CDA-4/6 User Manual
Page 4
Advertising
INSTALLATION and OPERATION
Do not connect the power line cord until all the video connec-
tions are completed.
Mount the unit in the equipment rack, using the supplied rack
mounting.
Connect all the video cables per the diagram. Please read the note
concerning output 2 on the application drawing.
Connect the power cord. Note the robust locking power connec-
tor.
Adjust the cable equalization, with the variable control for mini-
mum distortion using an appropriate test signal or full motion
video.
Perform the fi nal operational check.
TYPICAL APPLICATION
NOTE:
USE ONLY AN HD-15
TO HD-15 CABLE ON
OUTPUT 2 TO ENSURE
THAT ID BITS ARE
PASSED THROUGH TO
THE COMPUTER
FRONT AND REAR PHOTOS OF THE EQUIPMENT
Advertising