Greenheck, Installation – Greenheck Utility Distribution System User Manual
Page 5

GREENHECK
¨
October 1999
5
ELECTRICAL CONNECTIONS
Installation
1. If system has field joint(s), wiring must be
interconnected at the joint(s) before attaching
main service.
a. Connect corresponding busbars together
with the brass bolts and nuts that are
provided.
b. Connect control wiring (if supplied) to
corresponding terminals or quick
disconnect device.
2. Connect the electrical service(s) to the system
as follows:
a. Secure service conduit to the electrical
housing. A service entrance knockout
must be provided.
b. Attach main service wires to the
corresponding terminals.
c. For instructions regarding the fire fuel
shut-off, Please see Page 6.
d. Check and tighten all connections.
e. Connect all cord assemblies to the appropriate
equipment as shown on submittal drawing. Cut
cord assemblies if necessary to make a neat
appearance.
f. Wire conduit from hood light switch (if provided)
to hood lights. See electrical drawing.
g. Wire from steam timer terminal block (if
provided) to remote steam timer. See electrical
drawing.
h. Wire to exhaust fan motor starter or controls (if
provided). See electrical drawing.
BUSS BAR