ADMINISTRATOR MENU

Change PIN Code

Factory PIN code is 0000

Administrator pin code change.

Ask PIN

OFF, StartUp, Menu

Factory setting is OFF

PIN code inquiry selection
OFF: No PIN code inquiry.
StartUp: Control panel X 37 always asks for
the PIN code when the machine is turned
on. Wire feeder panel XF 37 (or XF 38) is not
affected and always works without PIN.
Menu: Control panel X 37 asks for the PIN
code every time when MENU button is
pressed and when the display is in channel
info mode (in start-up view). PIN code
inquiry is made only once when entering
the menu. After that the menu button can
be pressed any time without PIN inquiry.

4.5 Arc voltage display

FastMig X is capable of measuring and showing the voltage close to the welding arc. By taking

this feature into use you don't need to be concerned about the voltage losses in welding

cables anymore. With this feature you are only required to set the voltage for the arc before

welding and after welding you can see the voltage close to the arc.
In order to use the arc voltage feature, follow these steps:

1.

After setting up the welding equipment for the first time, connect the voltage sensing

cable to the welding piece and the measurement cable between the wire feeder and the

power source.

2.

If you are using a sub-feeder, enter the length of the sub-feeder to the SubFeederLength

parameter.

3.

Set the welding parameters according to your application. Note that the set voltage

when using 1-MIG, MIG and WiseThin+ welding processes means always the voltage in

the arc despite of ArcVoltage setting.

4.

Weld with 1-MIG, MIG or with Pulse MIG for at least 5 seconds. During that time the

welding machine calibrates itself for the welding cable length in question. Calibration

values are stored into the welding machine, therefore this calibration is required only

once after installing the welding machine package.

5.

If you want to see arc voltage in panels during and after welding, turn the ArcVoltage

setting to ON. Dot after voltage value in XF 37 or XF 38 panel means that showed value is

arc voltage. In the weld data after welding in X 37 panel 'AVol' means also the arc voltage.

6.

Voltage sensing cable can be removed after the calibration procedure, but it is

recommended to use it always.

NOTE!

Steps 1-3 should be repeated every time, when the length of the welding or grounding cable

is changed.