3 machine introduction, 4 positioning of the machine – Kemppi FastMig X 350 User Manual

Page 7

Advertising
background image

5

© Kemppi Oy / 1520

EN

2.3 Machine introduction

CHANNEL

V

6,3A

1.

2.

3.

4.

8.

10.

5.

7.

9.

6.

11.

1.

Control panel X 37

2.

Main switch (ON/OFF)

3.

Power on pilot lamp

4.

Overheating pilot lamp

5.

Welding cable connection, negative pole (–)

6.

Welding cable connection, positive pole (+)

7.

Control cable connection

8.

Fuse (delayed 6.3 A)

9.

Control cable connection

10. Mains power cable

11. Measurement cable connection

2.4 Positioning of the machine

Place the machine on a sturdy, level surface that is dry and does not allow dust or other

impurities to enter the machines cooling air flow. Preferably site the machine to a suitable

carriage unit so it is above floor level.
Notes for positioning the machine

• The surface inclination may not exceed 15 degrees.

• Ensure the free circulation of the cooling air. There must be at least 20 cm of free space in

front of and behind the machine for cooling air circulation.

• Protect the machine against heavy rain and direct sunshine.

NOTE!

The machine is not allowed to be operated in the rain as the protection class of the machine,

IP23S, allows preserving and storing outside only.

NOTE!

Never aim the spray of sparks from a grinding machine toward the equipment.

Advertising
This manual is related to the following products: