Remko rm – REMKO RM Series User Manual

Page 20

Advertising
background image

Supplementary
installation notes

The connections to the
refrigerant pipes may differ
when combining the outdoor
component with certain indoor
units. In this case, fit reducers or
flared fittings to the indoor unit
(included).

If the basic length of the
refrigerant pipe exceeds 5 m, add
refrigerant when commissioning
the system for the first time. (See
section "Adding refrigerant").

Only employ tools and
components suitable for
refrigeration applications.

NOTE

Flanging tool

8 Flanging the refrigerant pipe

Refrigerant pipe

Deburrer

7

Deburring the refrigerant pipe

9 Correct flange shape

Tighten with 1st open-ended

spanner

Counter

2nd open-ended spanner

10 Tightening the fitting

Tightening

torque:

1 4

“ 15-20 Nm

3 8

“ 33-40 Nm

1 2

“ 50-60 Nm

5 8

“ 65-75 Nm

3 4

“ 95-105 Nm

5. Verify that the shape of the

flange is correct(Fig 9).

6. First connect and hand-tighten

the refrigerant connections
to ensure they are correctly
seated.

7. Now fully tighten the fittings

using 2 suitably sized open-
ended spanners. Use one
spanner to counter the force
when tightening the fitting (Fig
10)

.

8. Use insulation hoses which are

designed for this temperature
range and diffusion tight.

9. Lay the refrigerant pipes from

the indoor unit to the outdoor
component. Ensure that the
fastenings are adequate and if
necessary, take appropriate oil
return measures!

10.Observe the permitted bending

radius for the refrigerant pipes
during installation. Never bend
a pipe twice in the same place.
Brittle pipes and potential
cracking are the consequences.

12.Ensure that structure-borne

sound is not transferred to parts
of the building. Use vibration
dampers to reduce the effects
of structure-borne sound!

13.Prepare the refrigerant pipe

for the outdoor component as
described above.

11.Use the wall or floor brackets

to fit the outdoor component
against structural parts
approved to support the static
load (refer to the installation
instructions for the brackets).

Verify the correct assignment
of injection and suction pipes.
Observe the letter markings!
Do no mix up the connections
between circuits.

CAUTION

REMKO RM

20

Advertising