Shut down the system using the
heat pump manager.

Switch off the power supply of
the outdoor unit.

Remove the right side panel.
This is achieved by undoing
three screws on the panel and
then pulling off the panel in a
downwards direction.

Connect the SYSTEM MONI-
TOR using the supplied connec-
tor to the CMN socket on the
control board of the outdoor
unit.

From page 7 onwards, you can
find a precise description of the
associated normal value ranges
of the System Monitor.

In the event of a fault, you can
find a precise fault description
with cause and remedy under
the "Fault codes" section.

Switch the power supply of the
outdoor unit back on.

Place the system back into
service using the heat pump
manager.

DIP switch SW2 allows targeted
diagnostics to be performed

Decommissioning

Operation

Shut down the system using the
heat pump manager.

Switch off the power supply of
the outdoor unit.

Remove the supplied connec-
tor for the SYSTEM MONITOR
from the CMN socket on the
control board of the outdoor
unit.

Switch the power supply of the
outdoor unit back on.

Place the system back into
service using the heat pump
manager.