Installation instructions, Power supply connections, Installation and commissioning instructions – Eneo PXB-2280Z10 D User Manual

Page 11

Advertising
background image

Installation Instructions

11

NETWORK AF ZOOM CAMERA

Power Supply Connections

Camera can work with either 24VAC or 12VDC, dual voltage power and PoE

(IEEE Std. 802.3af). Primary and secondary grounds are completely isolated

to avoid the possible ground-loop problems.

Installation and commissioning Instructions

• Make sure the power is removed before the installation.
• After all connections are finished properly, follow the order for applying power.
a) Plug the network cable into RJ-45 Ethernet Port.
If PoE is the unique power, there will be no need to connect Power terminal.
b) When DC12V or AC24V Local power is necessary, first connect the low
voltage (DC12V or AC24V), then plug the AC adapter to AC outlets to avoid
an improper reset from power jitter and a damage from the surge voltage
when no load.

50mm

50mm

■ EMI Ferrite Core Connection

~24V/DC12V (RED)
~24V/GND (BLACK)
ALARM-IN (GREEN)
ALARM-OUT (BLUE)
GND (GRAY)
AUDIO-IN (BROWN)
GND (GRAY)
AUDIO-OUT (ORANGE)

■ Attach the Signal Assignment Sticker
in a visible spot for wiring reference.

► When PoE and Local dual power are connected at the same time,

Local power has priority.

Advertising