Yaskawa MP900 Series MPLoader User Manual

Page 21

Advertising
background image

3.1 Startup and Operating Procedure

3-3

* 6. Click the Make MPL File Button in the Final Confirmation Dialog

Box displayed after completing the settings for the Option Window to
display the Save As Window. For details, refer to 3.6 Save As Window.

* 7. Completion notification is displayed if the file is saved successfully

after clicking the Save Button in the Save As Window. For details,
refer to 3.7 Completion Notification Dialog Box.

* 8. Click the Yes Button to complete the procedure in the Completion

Notification Dialog Box. Click the No Button to return to the CPU
Selection Window.

Details on the operating procedures for each window are explained on the following pages.

Advertising