6 working environment, 7 installation check – Hongdian H3324 4CH HDD MDVR User Manual

Page 26

Advertising
background image

 

2 -16

 

Connect power cable and ignition cable of H332x MDVR to stabilized voltage supply

correctly and then switch on the power supply.

 

2.6 Working environment

 

 

Voltage

 

DC+8~36V  

 

Working temperature

 

0 ºC ~+65ºC  

 

Store temperature

 

‐40 ºC ~+80ºC  

 

Relative humidity

 

95% (no condensing) 

2.7 Installation check

 

Precondition

Connect all cables correctly

 

 

Before power on the equipment, please confirm power supply cable is correctly

connected, especially to make sure 12V power output cable not to short cut with metal
case, BNC metal end, GND cable.

 

 

Operation steps

Step1

Install antenna 

 

Step2

Check SIM card is installed correctly and SIM card is activated. 

 

Step3

Connect power cable of H332x MDVR, and power on it. 

 

After power on, if power and run indicator light is on, it shows the equipment is working
normally.

 

After power on, if ETH indicator light is on, it shows network connection is normal.

 

Advertising
This manual is related to the following products: