Maintenance and service – Enviro Westport C-10381 User Manual

Page 11

Advertising
background image

11

Using a ½" deep

socket remove/reinstall

the main burner orifice.

Undo the two

(2) screws that

hold burner in

the firebox.

Rotate handles

and remove the

door and glass.

Lift off the pilot

head and replace

with proper pilot

orifice for fuel type

to be used.

Venturi adjustment

bracket.

Pilot assembly moved

from firebox for clarity.

Figure 8: Unit burner shown apart.

Maintenance And Service

F

ueL

c

onveRsion

:

TO BE INSTALLED BY A QUALIFIED SERVICE AGENCY ONLY

Please read and understand these instructions before installing.

valve upstream of the unit. CAUTION:

The gas supply must be shut off prior to

disconnecting the electrical power and

before proceeding with the conversion.

Allow the valve and unit to cool down to

room temperature.

2. Remove the glass as shown in the

M

aintenance

and

S

ervice

- G

laSS

d

oor

r

eMoval

.

3. Carefully remove the log set and ember

material if they are installed.

4. Remove the burner as shown in the

M

aintenance

and

S

ervice

- b

urner

r

eMoval

.

5. Convert the burner orifice(s):

a) Remove the main burner orifice with a

½ inch deep socket.

b) Put a bead of pipe-thread sealant or

approved Teflon tape on the orifice

threads before installing into the brass

elbow.

c) Install the new orifice(s) from the kit

into the brass elbow.

Warning: This conversion kit shall be installed by a qualified service agency in accordance

with the manufacturer’s instructions and all applicable codes and requirements of the

authority having jurisdiction. If the information in these instructions is not followed

exactly, a fire, explosion or production of carbon monoxide may result causing property

damage, personal injury or loss of life. The qualified service agency is responsible for

the proper installation of this kit. The installation is not proper or complete until the

operation of the converted appliance is checked as specified in the manufacturer’s

instructions supplied with the kit.

Kit Parts List:

1 - Orifice (NG - #39 DMS or LP - #53 DMS)

1 - Pilot Injector (NG 0.62 mm; LP 0.35 mm)

1 - Installation instruction sheet

1 - Conversion label

Carefully inspect all parts supplied with this conversion kit. If any parts have been damaged or are

missing, contact your dealer, distributor or courier company to have them replaced before starting this

installation.

Conversion Kit Installation:
1. Turn control knob on the gas valve to the “OFF” position and shut the gas supply off at the shut-off

Advertising
This manual is related to the following products: