Initial installation – Enviro Westport C-10381 User Manual

Page 25

Advertising
background image

25

Figure 36: Cathedral Ceiling Support Box

Installation.

Initial Installation

QUALIFIED INSTALLERS ONLY

Figure 37: Corner installation rear vented with

snorkel.

Figure 38: Corner installation top vented.

c

oRneR

i

nstaLLations

:

Do not interfere with the structural integrity of the walls.
When rear venting if a 90° bend is used the maximum horizontal vent that can be used is 6” (152mm)

and if a 45° bend is used the maximum horizontal vent that can be used is 12” (305mm). For installations

with a 36” (915 mm) snorkel refer to Figure 37 and i

nitial

i

nStallation

- v

ent

c

onfiGurationS

and

r

eStrictor

S

ettinGS

. For other corner installations refer to Figure 38 and i

nitial

i

nStallation

- v

ent

c

onfiGurationS

and

r

eStrictor

S

ettinGS

.

5. Using tin snips, cut the “Support Box” from the top corners

down to the roof line, and fold the resulting flaps over the

roof sheathing (Figure 36). Before nailing it in to the roof,

run a bead of non-hardening mastic around the top edges

of the “Support Box”, to make a seal between the box and

the roof. Clean out any combustible material from the

inside of the “Support Box”.

6. Complete the cathedral ceiling installation by following the

same procedures outlined in Steps 4 through 9 for i

nitial

i

nStallation

- v

ertical

i

nStallation

.

Advertising
This manual is related to the following products: