Initial installation – Enviro Westport C-10381 User Manual

Page 24

Advertising
background image

c

atheDRaL

c

eiLing

i

nstaLLation

:

Figure 33: Use of Wall Straps.

Figure 34: Multi-Story Vent Pipe Installation.

Initial Installation

QUALIFIED INSTALLERS ONLY

24

Figure 35: Cathedral Ceiling Support Box Leveling.

1. Follow installation steps 1 & 2 under i

nitial

i

nStallation

- v

ertical

i

nStallation

.

2. Using the plumb bob, mark the centerline of

the venting system on the ceiling and drill a

small hole through the ceiling and roof at this

point. From the roof, locate the drill hole and

mark the outline of the “Cathedral Ceiling

Support Box”.

3. Remove shingles or other roof coverings as

necessary to cut the rectangular hole for the

“Support Box”. Cut the hole ⅛” larger than

the “Support Box” outline.

4. Lower the “Support Box” through the hole in

the roof until the bottom of the “Support Box”

protrudes at least 2 inches (5 cm) below the

ceiling. Align the “Support Box” both vertically

and horizontally with a level as shown in

Figure 35. Temporarily tack the “Support Box”

in the place through the inside walls and into

the roof sheathing.

Advertising
This manual is related to the following products: