Maintenance and service – Enviro Westport C-10381 User Manual

Page 12

Advertising
background image

12

Figure 9:

Removing valve

cap.

Maintenance And Service

the HI/LO knob by hand shown in Figure 9.

Figure 11: Flip

valve screw.

b) Insert a

5

/

32

” or 4 mm Allen wrench into

the hexagonal key-way of the screw (see

Figure 10), rotate it counter-clockwise

until it is free and extract it.

c) Check that the screw is clean and if

necessary remove dirt.

d) Flip the screw (refer to Figure 11).
e) Using the Allen wrench as shown in

Figure 10, rotate the screw clockwise

Figure 12: O-ring on valve screw.

Figure 10: Removing

valve screw.

6. Convert the pilot injector:

a) Pull the pilot hood straight up to access

the pilot injector.

b) Using a

5

/

32

” or 4 mm Allen key,

remove the pilot injector.

c) Install the new pilot injector supplied

with this conversion kit. Simply screw

the new injector inside the pilot hood

using the Allen key,

d) Reinstall the hood by placing the hood

on the assembly, line up the key way,

and snap into place.

7. Convert the SIT gas valve:

a) Remove the black protection cap from

Figure 13. Ignitor

assembly beside the

burner.

until a torque of 9 inch lbs. WARNING! Do not over tighten the screw. It is

recommended that you grip the wrench by the short side.

f) Verify that if the conversion is from NG to LPG, the screw must be re-

assembled with the red o-ring visible (refer to Figure 12). If the conversion

is from LPG to NG, the red o-ring of the screw must be not visible.

g) Re-attach the black protection cap that was removed in step a (Figure 9).

8. Reinstall the burner, brick panels, log set, embers, and glass door. Also refer

to S

econdary

i

nStallation

- l

oG

S

et

and

e

MberS

i

nStallation

. When re-installing the

burner, ensure that the burner to pilot hood relationship is similar to what is

shown in Figure 13. On some units you will need to pay special attention when

installing the burner that the venturi adjustment rod is properly installed into

the venturi adjustment piece welded to the burner venturi tube

9. Reconnect the main gas line if it was disconnected and open the shut-off valve at the gas line to the

unit.

10. Use a small brush to apply a warm soapy water solution to all gas connections (use a half dish soap

and half warm water). If a gas leak is present, bubbling will occur. Gas leaks can be repaired by

using an approved pipe thread sealant or approved Teflon tape. NEVER USE AN OPEN FLAME WHEN

TESTING FOR LEAKS.

11. Reconnect the electrical power to the unit.
12. Relight the main burner in both the “HI” and “LO” positions to verify proper burner ignition and

operation and proper flame appearance. Also refer to S

econdary

i

nStallation

- l

oG

S

et

and

e

MberS

i

nStallation

for a flame appearance picture.

13. MAKE SURE that the conversion label is installed on or close to the rating label to signify that the

unit has been converted to a different fuel type.

Advertising
This manual is related to the following products: