3-INSTALLATION AND ASSEMBLY

Technical Dept. - All rights reserved - Reproduction is prohibited

FASTENING TO THE BASE OF THE INSERT

It is mandatory to anchor the product to a support as the authorised technician can remove the combustion chamber from its seat by

means of two extendable guides while performing the annual maintenance.

Fasten the insert as follows:

• The depth of the insert inside the frame is 540 mm.

• The safe distance from combustible material is 50 mm

• If the product is to be installed with the pellet loading from the front, simply leave 50 mm behind the product (safe distance for

flammable material); if the pellet loading is to be on the side, 50 mm can still be left behind the product, however, tilt the pipes of

both the combustion air and the loading. Otherwise, the door cannot be fastened to the wall. If the pipe is kept straight outwards,

at least 150 mm must be left behind.

Proceed as follows, irrespective of the loading position selected (front or side):

• Remove the compensation frame C (see the relative paragraph).

• Loosen the lower screws (B) under the frame.

• Then remove the machine and separate it from its support (D).

• Place the support (D) 50 mm (MIN.) away from the wall.

• Fasten the support (D) to the base (E) with the screws supplied, making sure that the support anchor surface (D) and the wall are

perpendicular.

• Set the machine back on the support (D), insert the screws (B) again, making sure the machine and the support are well secured in

order to guarantee product operation.

It is very important to make sure the positioning measurements of the product base have been respected and the support

anchor surface and the wall are perpendicular. Also make sure that the screws secure the machine to the support.