EMI WLHA User Manual

Page 6

Advertising
background image

www.enviromaster.com

WLCA/WLHA High Wall Evaporator

6

Electrical Wiring site preparation

All wiring should be in accordance with the
National Electric Code (NEC) and the local

building codes.

1. Make sure power is off.
2. Check the unit rating plate for circuit am-

pacity and breaker or time delay fuse size.
Use only HACr type breakers. Select
the proper wire for the ampacity rating.

3. Each unit must have a separate branch

circuit protected by a time delay fuse or

breaker. Refer to the unit rating plate

2. Lift and remove the front grill to expose

the third screw.

1. T

he left end cap of the unit needs to be

removed to access wiring diagram and

electrical wiring. This entails removal of
three screws.

Locate Electrical Wiring

for the proper wire and breaker or time

delay fuse size.

4. Inspect the existing wiring for any defects

such as cut or frayed wires. Replace if

any such wiring if found.

NOTE: On units rated 208/230V, the
primary side of the transformer is
factory wired for 230V. For a 208V
power supply, the transformer tap
must be changed from orange to
red. Refer to the wiring diagram
located on the inside of the left end
cap of the unit.

3. Once the screws are removed,

slide the left end cap

off to expose control
box and locate the

wiring diagram on

the inside of the

end cap.

c

ontrol box

Remove screw

Helpfull Hint:

Prior to re-

m o v e i n g

the endcap
and bottom

use a small

board to prop

the unit away

from the wall.

Board

WLCA/WLHA HiGH WALL EVAporAtor instALLAtion instrUCtions

Advertising
This manual is related to the following products: