Heat & Glo Fireplace 6000 XLT User Manual

Page 26

Advertising
background image

23

If the area above the ceiling IS an attic, position and
secure the firestop on top of the previously framed
hole.

This shows an attic
installation.

1. Keep insulation away

from the vent pipe at
least 1 inch (25 mm).

NAILS (4 REQUIRED)

CEILING FIRESTOP

RAFTER

CEILING

Figure 23. Attic Firestop

C. Vent Termination

For Horizontal Terminations - To attach and secure
the termination to the last section of horizontal vent:

• Rotate and interlock the ends as described at the

beginning of the Installing Vent Components sec-
tion.

• The termination kit should pass through the wall

firestops from the exterior of the building.

• Adjust the termination cap to its final exterior posi-

tion on the building.

WARNING
THE TERMINATION CAP MUST BE
POSITIONED SO THAT THE ARROW IS
POINTING UP.

For roundcap termination kits:

• Use the exterior pipelock hole provided on the round

flange of the wall firestop to secure the vent pipe in
place.

For trapezoidal cap termination kits:

• Using screws, secure the cap to the exterior wall

through the flanges built into the cap.

• Use a high-temperature sealant or fiberglass rope

gasket to seal between the pipe and exterior
firestop.

Advertising
This manual is related to the following products: