reqUireMentS FOr the cOMMOnWeALth OF

MASSAchUSettS

For all side wall horizontally vented gas fueled

equipment installed in every dwelling, building or

structure used in whole or in part for residential

purposes, including those owned or operated by

the Commonwealth and where the side wall ex-

haust vent termination is less than seven (7) feet

above finished grade in the area of the venting,

including but not limited to decks and porches,

the following requirements shall be satisfied:

INSTALLATION OF CARBON

MONOXIDE DETECTORS

At the time of installation of the side wall horizon-

tal vented gas fueled equipment, the installing

plumber or gasfitter shall observe that a hard

wired carbon monoxide detector with an alarm

and battery backup is installed on the floor level

where the gas equipment is to be installed. In

addition, the installing plumber or gasfitter shall

observe that a battery operated or hard wired car-

bon monoxide detector with an alarm is installed

on each additional level of the dwelling, building or

structure served by the side wall horizontal vented

gas fueled equipment. It shall be the responsibility

of the property owner to secure the services of

qualified licensed professionals for the installation

of hard wired carbon monoxide detectors.

In the event that the side wall horizontally

vented gas fueled equipment is installed

in a crawl space or an attic, the hard wired

carbon monoxide detector with alarm and

battery back-up may be installed on the next

adjacent floor level.

In the event that the requirements of this

subdivision can not be met at the time of

completion of installation, the owner shall

have a period of thirty (30) days to comply with

the above requirements; provided, however,

that during said thirty (30) day period, a battery

operated carbon monoxide detector with an

alarm shall be installed.

Approved Carbon Monoxide Detectors

Each carbon monoxide detector as required

in accordance with the above provisions shall

comply with NFPA 720 and be ANSI/UL 2034

listed and IAS certified.

SIGNAGE

A metal or plastic identification plate shall be

permanently mounted to the exterior of the

building at a minimum height of eight (8) feet

above grade directly in line with the exhaust

vent terminal for the horizontally vented gas

fueled heating appliance or equipment. The

sign shall read, in print size no less than 1/2" in

size, "GAS VENT DIRECTLY BELOW. KEEP

CLEAR OF ALL OBSTRUCTIONS".

INSpECTION

The state or local gas inspector of the side

wall horizontally vented gas fueled equipment

shall not approve the installation unless, upon

inspection, the inspector observes carbon

monoxide detectors and signage installed in

accordance with the provisions of 248 CMR

5.08(2)(a) 1 through 4.

EXEMPTIONS: The following equipment is ex-

empt from 248 CMR 5.08(2)(a) 1 through 4:

• The equipment listed in Chapter 10 entitled

"Equipment Not Required To Be Vented"

in the most current edition of NFPA 54 as

adopted by the Board; and

• Product Approved side wall horizontally

vented gas fueled equipment installed in a

room or structure separate from the dwell-

ing, building or structure used in whole or

in part for residential purposes.

MANUFACTURER REqUIREMENTS

Gas Equipment Venting System Provided

When the manufacturer of Product Approved

side wall horizontally vented gas equipment

provides a venting system design or venting

system components with the equipment, the

instructions provided by the manufacturer for

installation of the equipment and the venting

system shall include:

• Detailed instructions for the installation of

the venting system design or the venting

system components; and

• A complete parts list for the venting system

design or venting system.

Gas Equipment Venting System Not

provided

When the manufacturer of a Product Ap-

proved side wall horizontally vented gas fu-

eled equipment does not provide the parts for

venting the flue gases, but identifies "special

venting systems", the following requirements

shall be satisfied by the manufacturer:

• The referenced "special venting system" in-

structions shall be included with the appliance

or equipment installation instructions; and

• The "special venting systems" shall be Prod-

uct Approved by the Board, and the instruc-

tions for that system shall include a parts list

and detailed installation instructions.

A copy of all installation instructions for all

Product Approved side wall horizontally

vented gas fueled equipment, all venting in-

structions, all parts lists for venting instruc-

tions, and/or all venting design instructions

shall remain with the appliance or equipment

at the completion of the installation.