Operation, Fvr-c9s-7ux – GE FVR-C9S-7UX User Manual

Page 19

Advertising
background image

19

FVR-C9S-7UX

11. Operation

Pre-Operation Inspection

• Check for wiring errors.

• Check that all loose wire stands, metal

chips and unnecessary screws, etc. have
been removed.

• Check that no screws, terminals, etc. are

loose.

• Check that the wire ends of crimp terminal

are not in contact with other terminals.

Test Run Check Points

• Smooth rotation and correct rotation

direction.

• No abnormal vibrations and noise from

the motor.

• Smooth acceleration and deceleration.

Frequency Setting Method

• Frequency setting by potentiometer con-

trol (factory preset at the time of ship-
ment; F01:1). As wired at the factory,
frequency setting can be performed by
turning the potentiometer control knob on
the keypad panel. Turn the potentiometer
control knob clockwise to increase fre-
quency.

• Frequency setting by digital signal (F01 :

0). With the function F01 set to 0, fre-
quency can be increased or decreased by
the
UP/DOWN) keys on the keypad panel.
UP: Frequency up
DOWN: Frequency down

RUN/STOP Method

• RUN/STOP by keypad panel operation

(Factory preset at the time of shipment
F02:0).

• The drive is shipped with a factory in-

stalled jumper, between FWD-CM. Only
forward operation is possible. To enable
reverse operation, remove the jumper
from FWD/CM and install the jumper
between REV-CM.

• RUN/STOP by terminal operation (F02 : 1)

Note: Open FWD and REV terminals when
changing F02 data. Data cannot be changed
if not open.

RUN

STOP

Time

Frequency

Forward

Reverse

FWD-CM

REV-CM

ON

ON