22

INSTALLATION INSTRUCTIONS

COMMISSIONING

6.1

Close all windows and doors to the room, check all
controls, and allow fire to burn on maximum for 5 minutes.
Test for spillage of flue products using a smoke match. Pass
the lighted smoke match along the top front edge just
inside the opening or canopy. See diagram 34.

6.2

If the fire spills, run for a further 10 minutes and re-check.
If there is still spillage, disconnect the fire and seek expert
advice

6.3

If there are extractor fans in the room or adjacent rooms,
the spillage test must be repeated with the extractors
running on maximum.

6.4

The burner pressure on this appliance is pre-set, provided
the correct inlet pressure is obtained at the test point on
the inlet connection, with the appliance on full, the
appliance will work correctly. Carrying out a gas rate test
will check the correct operation.
( The test points on the gas valve are not used on this
appliance.)

6. COMMISSIONING

34