Operating Manual LP 33 Series 30 & 40 kVA

7.1.4 Complete

shutdown


As a result of this procedure the UPS is completely switched OFF and not powered.

NOTE !

This procedure involves all equipment powered by UPS, to be shut down.


1. Perform the command total off.

2. Switch OFF the output switch Q1 (Pos. 0).

3. Remove the battery fuses F5, F6, F7 and eventual external fuses in case of external battery.

4. In order to discharge the DC link capacitors, start once more

the inverter through the screen:
MENU/COMMAND MENU/INVERTER ON

COMMAND MENU

INVERTER ON *
INVERTER OFF

Remark: command

INVERTER ON will be enabled only when

the inverter voltage of each phase decreases
below 7 VAC (about 30 seconds).

INVERTER: U1=

7V

U2= 7V U3=

7V

Frequency = 60.0Hz

Synchronized

Before proceeding to step 5, check on the display panel that

the DC link voltage (both polarities) Udcp and Udcn has reached
the minimum voltage of 5 VDC (about 30 seconds).

Udcp= 5V Udcn=

5V

Ubp=0V

Ubn=0V O

Charge level

= 0%

Autonomy =

0min

5. Switch OFF the inverter by entering the screen:

MENU/COMMAND MENU/INVERTER OFF

COMMAND MENU

INVERTER ON
INVERTER OFF *

6. Switch OFF the mains power at the AC input distribution panel.

END OF PROCEDURE

CAUTION !

If the above procedure is not completely performed, it could cause
serious damages to the UPS.

WARNING !

In case the procedure described on step “4 - discharge DC link capacitors” cannot be
completely performed, the DC capacitors could be charged with dangerous voltage

for about 15 minutes.
Wait until capacitors are completely discharged before starting the UPS again.