GE Industrial Solutions LP 33 Series 30 & 40 kVA Operating Manual User Manual

Page 51

Advertising
background image

Modifications reserved

Page 51/57

OPM_LPS_3UO_30K_40K_0US_V010.doc

Operating Manual LP 33 Series 30 & 40 kVA

7.2.7 Restore to normal operation after “total off”

NOTE !

Make sure the all units of the parallel system to be status of the activation of “total
off”
, i. e. Q1 closed, Q2 open the battery fuses F5, F6, F7 (and eventual external fuses in
case of external battery) connected.


View of the panel after pressing the button “total off”:

All Contactors are open.

Booster, inverter eand Static-Switch shutdown.

LP 33 40kVA P1

APPLICAT. SUPPLY OFF

= 0%


1. Reset

total off of the parallel system.

Restore the command “total off”, on any one of the units, by

entering the screen: MENU/RESET TOTAL OFF

LED TEST
RESET TOTAL OFF

*

The load is supplied by the mains through the automatic
bypass
.
The booster starts automatically.

The LCD screen must display on all Units the status:
APPLICATION ON BYPASS

LP 33 40kVA P1
APPLICATION ON BYPASS

= 70%

2. Switch ON the inverter on first unit by entering the screen:

MENU/COMMAND MENU/INVERTER ON
In case of sufficient output power, the output will transfer to

Inverter.

COMMAND MENU

INVERTER ON *

INVERTER OFF

3. Switch ON the inverter on the other units by entering the

screen: MENU/COMMAND MENU/INVERTER ON
(Do not start the next inverter until the sequence of the previous
one ends – about 10 seconds).

COMMAND MENU

INVERTER ON *

INVERTER OFF

LP 33 40kVA P1

APPLICATION ON UPS

= 70%

As soon as the output power of the inverters is sufficient to
supply the load, the output of the units with running inverter

will transfer to inverter.
The LCD screen must display on all Units the status:
APPLICATION ON UPS

END OF PROCEDURE

Advertising