GE Industrial Solutions LP 33 Series 30 & 40 kVA Operating Manual User Manual

Page 45

Advertising
background image

Modifications reserved

Page 45/57

OPM_LPS_3UO_30K_40K_0US_V010.doc

Operating Manual LP 33 Series 30 & 40 kVA

7.2.2

Parallel UPS shutdown with load transfer on manual bypass (Q2)


The purpose of this procedure is to supply the load directly by mains through manual bypass Q2.


This procedure is normally performed when the UPS must be completely switched OFF for maintenance
or service purpose, performed by an authorized Service Center.





1. Switch OFF the inverter on each unit entering the screen:

MENU/COMMAND MENU/INVERTER OFF
Attention
: to switch OFF permanently the inverter the key

Enter must be pressed 2 times.

COMMAND MENU

INVERTER ON
INVERTER OFF *

The output will be supplied by the mains through all automatic
bypass
.

LP 33 40kVA P1

APPLICAT. ON UTILITY

= 70%

2. Switch ON the maintenance bypass Q2 (I) on each unit.

LP 33 40kVA P1

APPL. ON MANUAL DEV.

= 70%

3. Switch OFF the output switch Q1 (0) on each unit.

4. Perform the command total off on each unit.

5. Remove the battery fuses F5, F6, F7 (and eventual external fuses in case of external battery) on

each unit.



Continue

Advertising