9 maintenance, 1 general maintenance, 2 cooling fan maintenance – GE Industrial Solutions LP 33 Series 30 & 40 kVA Operating Manual User Manual

Page 54: 3 battery maintenance

Advertising
background image

Modifications reserved

Page 54/57

OPM_LPS_3UO_30K_40K_0US_V010.doc

Operating Manual LP 33 Series 30 & 40 kVA

9 MAINTENANCE

WARNING !

All maintenance and service works must be performed by QUALIFIED SERVICE PERSON.


9.1 GENERAL

MAINTENANCE

When used properly, the LP 33 Series UPS is virtually maintenance free.

Take care of proper environmental conditions (see Installation Guide - Section 3.5 – Ventilation & Cooling)

and keep air inlets/outlets free from dust and any other obstacle.


9.2 COOLING

FAN

MAINTENANCE

The expected operational life of the cooling fans is approximately 40.000 hours of continuous

operation.

A high ambient temperature will shorten this operational life.


9.3 BATTERY

MAINTENANCE

The service life of the battery is from 3 to 6 years, depending on the operating temperature and on the
number of discharge cycles.

The UPS LP 33 Series offers the possibility of SBM (Superior Battery Management).
The function SBM can be activated through a service Parameter.
The functionality of SBM reduces the Battery recharging time together with improved lifetime of the

Battery.

As a healthy battery is essential to the performance of the UPS, an automatic or manual battery test
can be performed regularly to ensure failsafe operation, in order to check if the battery can provide the

expected backup time in case of mains failure.
We recommend the battery test be performed at least every 1 month, especially if the battery is not
sufficiently discharged during normal operation.
Since the parameter enabling the battery test protected by user password, please contact your Service
Center
for more information.

Please consider that, if you did a full battery test to verify the full runtime of the battery, the charger
needs at least 8 hours to recharge the battery up to 90% of its capacity.

To guarantee that the battery is fully charged, the UPS system should be in operation for at least 12

hours every 3 months.

When the condition of the battery is critical, the warning signal will be activated (general alarm, buzzer
and alarm message “4118 - Battery fault”).

In this case the battery must be replaced as soon as possible.
Please contact your Service Center.

Advertising