Ldvr series direct vent gas fireplace, Vertical through-the-roof applications – Majestic Appliances 36LDVR User Manual

Page 18

Advertising
background image

18

LDVR Series Direct Vent Gas Fireplace

10007317

Do not back fill around snorkel. A

clearance of at least 4” (102mm) must be

maintained between the snorkel and the

soil.

BG401

Snorkel

2/10/99 djt

Foundation Recess

Snorkel

Wall Screws

Recess Brackets

Watertight Seal

Around Pipe

Sheet Metal

Screws

BG401

Fig. 32 Snorkel installation, recessed foundation.

BG400

Below grade installation

2/10/99 djt

10/19/99 added standoffs

24" (610mm)

Minimum*

Zero Clearance

Sleeve

(if required)

Firestop

7” Pipe

7TDVSNORK

(Snorkel)

4” (102mm)

Clearance

Min.

Window

Well

Gravel

Drain

Foundation Wall

BG400

Fig. 31 Below grade installation.

*A minimum of 24” (608mm)

vertical pipe must be installed

when using 7TDVSNORK Kit.

If the foundation is recessed, use recess brackets (not

supplied) for securing lower portion of the snorkel.

Fasten brackets to wall first, then secure to snorkel

with self drilling #8 x 1/2 sheet metal screws. It will be

necessary to extend vent pipes out as far as protruding

wall face. (Fig. 32)

This Gas Fireplace has been approved for:

1. Vertical installations up to 40ʼ (12 m) in height. Up to

10ʼ (3 m) horizontal vent run can be installed within

the vent system using a maximum of three 90°

elbows.

Vertical Through-the-Roof Applications

CFM148

Maximum

10ʼ

(3 m)

Minimum

8ʼ (2.4 m) /

Maximum

40ʼ (12 m) Vertical

Rise

CFM148

Pipe Straps Every

3ʼ (914 mm)

Fig. 33 Support straps for horizontal runs.

This Gas Fireplace has been approved for:

1. Vertical installations up to 40ʼ (12 m) in height. Up to

10ʼ (3 m) horizontal vent run can be installed within

the vent system using a maximum of three 90°

elbows.

2. Up to two 45° elbows may be used within the

horizontal run. For each 45° elbow used on the

horizontal level the maximum horizontal length must

be reduced by 18” (457 mm).

Example: Maximum horizontal length

0 x 45° elbows = 10ʼ (3 m)

1 x 45° elbows = 8¹⁄₂ʼ (2.6 m)

2 x 45° elbows = 7ʼ (2.1 m)

3. A minimum of an 8ʼ vertical rise.

4. Two sets of 45° elbows offsets within these vertical

installations. From 0 to a maximum of 8ʼ (2.4 m) of

vent pipe can be used between elbows. (Fig. 34)

5. 7DVCS must be used to support offsets. (Fig. 34)

This application will require that you first determine

the roof pitch and use the appropriate 7DVSKV (A, B

or F). (Refer to Venting Components List, Page 21)

Advertising
This manual is related to the following products: