Ldvr series direct vent gas fireplace, Fuel conversion instructions – Majestic Appliances 36LDVR User Manual

Page 30

Advertising
background image

30

LDVR Series Direct Vent Gas Fireplace

10007317

The conversion of this appliance from one

gas to another must be carried out by an

authorized service provider.

1. Disconnect power to the unit and shut off the gas sup-

ply.

2. Remove window frame assembly.

3. Carefully remove the logs & lava rock material.

4. Remove the screws that are holding the burner hous-

ing in place.

5. Remove the burner housing assembly. Depending on

the model of the appliance you may have to loosen

the pilot bracket retaining screw/nut to allow the pilot

and bracket assembly to tilt and give enough clear-

ance to remove the burner housing assembly.

6. Remove the main burner orifice and replace it with the

orifice supplied in the conversion kit.

7. SIT top Convertible Pilot

Gently lift off the pilot hood from the pilot. (Do not re-

move the spring clip holding the hood in place). Using

a 5/32” Allen key, unscrew the exposed orifice. Insert

the new orifice supplied in the kit, do not over tighten

the orifice. Replace the pilot hood ensuring the index

tab aligns with the notch on the hood.

8. PSE Pilot

Using a suitable wrench on the hexagonal body un-

screw the pilot hood assembly from the pilot, do

not twist the hood itself. Remove the orifice and

replace it with the new orifice supplied in the kit. Refit

the pilot hood assembly. Do not over-tighten the pilot

hood. The hood must return to its original alignment.

Take care not to damage the thermocouple, thermo-

pile or igniter.

9. SIT 820 NOVA Gas Control Valve (Fig. 52)

a. Using a Torx T20 or slotted screwdriver, remove

and save the three pressure regulator mounting

screws (A), pressure regulator tower (B) and

diaphram (C).

b. Ensure the rubber gasket (D) is properly positioned

and install the new HI/LO pressure regulator to the

valve using the new screws (E) supplied with the

kit. Tighten screws securely. (Reference torque - 25

in.LB)

c. Install the enclosed identification label (F) to the

valve body where it can be easily seen.

Honeywell Gas Control Valve (Fig. 53)

The Honeywell valve fitted to this unit is suitable for

use with LP or Natural Gas. It is converted to the

required gas application by the installation of a color

coded “conversion screw”.

a. Using a suitable small screwdriver lift out the

central regulator cap from the “HI/LO” knob on the

valve.

b. Unscrew the exposed conversion screw.

c. Insert the new color coded conversion screw. Do

not over-tighten the screw, it must be finger tight.

Fuel Conversion Instructions

d. Refit the regulator cap.

e. Mount conversion label supplied with conversion

screw to valve in a visible position.

10. Reassemble the fireplace in the reverse order, except

for the window frame assembly. Leave this off until

after the unit has been checked for leaks and the gas

supply has been bled.

11. After bleeding the gas line and checking for leaks with

a soap solution, replace the window frame assembly.

Fire up the unit, check for flame impingement on the

logs, adjusting them if necessary. Check the manifold

and supply pressures against the appliance specifica-

tions.

The procedure for converting from one gas to

another is the same regardless of the initial

gas used. The only variation is in the orifice

sizes and component part numbers. Your

authorized service provider will ensure the

correct parts are used.

LO

HV120

Honeywell valve

conversion

9/24/02 djt

Regulator Cap

Conversion Screw

Pressure Regulator

Housing

HV120

Fig. 53 Honeywell Gas Valve.

Fig. 52 Nova SIT820 Gas Valve.

D

E

F

FC108

SIT

regulator

conversion

10/03

OFF

PIL

OT

O

FC107

SIT820

valve conversion

10/03

A

B

C

OFF

PIL

OT

O

FC107/108

Advertising
This manual is related to the following products: