Connecting the power supply, Configuring the network port, Warning – Symmetricom XL-GPS User Manual

Page 26

Advertising
background image

16

997-01530-01, Rev. C-25, Jan 2008

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

1

– J2 Output (Rate, PPO)” on page 96

,

“F113 – J3 Input (Freq Meas)” on page 100

.

Figure 3: Connectors: ANTENNA, SERIAL I/O, J1, J2, J3, NET, 1 PPS, CODE, ALARM

Connecting the Power Supply

Warning:

Ensure that a disconnect device, such as a switch, with the appropriate voltage/

current rating is provided when operating/installing the XL-GPS.

Connect the Power Supply it to a power source. The green STATUS light indicates that the XL-GPS is
receiving power.

Notes for optional DC power supplies:

Use a 15 amp circuit breaker in series with the DC power source; don’t connect directly to a DC

power source without the breaker.

14 gage wire is the minimum recommended for DC power source hookup.

DC Power Supply Only to be used in a restricted access area.

The screw torque range on the Power Terminal Block is 5 to 8 inch pounds.

When connecting to a DC power source, first connect the positive power cable to “+” on the

power supply, then connect the negative power supply cable to “

−”.

Upon receiving power, the XL-GPS goes through its startup sequence; displaying “Booting”, Loading”,
and “Starting”. After approximately 40 seconds, the XL-GPS displays the clock status, and user
interfaces (front panel/command line) become available.

Configuring the Network Port

The following additional steps are required to make the XL-GPS operational on a network. Make the XL-
GPS operational on a network if you plan on:

Managing the XL-GPS remotely over the network

Distributing timing information from the XL-GPS over the network

Press

Result

ENTER

Displays “FUNCTION”

100

Enters 100 as the function number

Advertising