PART 3 EXECUTION

3.01 INSPECTION

a. Verify that the location is ready to receive work

and the dimensions are as indicated.

a. Do not install AC Drive equipment until the

building environment can be maintained within
the service conditions required by the
manufacturer.

3.02 PROTECTION

a. Before and during the installation, the AC

Drive equipment shall be protected from site
contaminants and debris.

3.03 INSTALLATION

a. Installation shall comply with manufacturer's

instructions, drawings and recommendations.

b. The AC Drive manufacturer shall provide a

factory certified technical representative to
supervise the contractor's installation, testing
and start-up of the AC Drive(s) furnished
under this specification for a maximum total of
[1,2,3] days. The start-up service shall be
quoted as a separate line item.

3.04 TRAINING

a. An on-site training course of [1,2] training days

shall be provided by a representative of the AC
Drive manufacturer plant and/or maintenance
personnel and quoted as a separate line item.

END OF SECTION