Server Technology PP02 User Manual

Page 40

Advertising
background image

Step 2

Locate the included cable-mount IEC 320 /C14 male inlet connector assembly (illustrated below) and a multiple outlet
power or surge-protection strip specific to your country of installation (not included). The next action requires the user to
install the IEC 320 /C14connector assembly to the end of the country specific multiple outlet strip (replacing the country
specific male plug). Follow these steps (note that all measurements are listed in millimeters):

Ground (Green/Yellow Or Green)

Clamp

Neutral (Blue Or White)

Line (Brown Or Black)

6.0

25.0

A Cut off the country specific male end of the multiple outlet/surge strip. Strip the ends of the three electrical cords, as

shown in the above diagram, to expose 6.0 mm of each conductor.

B Remove the screw from the IEC 320 male connector assembly and open the unit. Remove the two smaller screws

securing the Clamp. Also, remove the rubber jacket (plug bend relief) and slide it over the stripped ends onto the
cord of the multiple outlet/surge strip.

Remote Power On/Off

Appendix A | 220VAC IPM

40

Advertising
This manual is related to the following products: